Cool sunset with some weird reflection from the upstairs front windows. |
This is our blog on the new home we're building in the Sycamore Run community. This is the first blog that we've done so please bear with us as we travel down the blogging path. Please provide comments, suggestions, or tips if you like. We hope you enjoy it.
Thursday, April 23, 2015
Having walked thru the house after the insulation was put into place and seeing all of the drywall boards stacked up in each room - we were expecting 2 or 3 days to get it all installed. NOPE! It took the builders 1 full day to install ceiling and wall drywall. Very impressed. We saw some things that we hope will be fixed before they plaster and paint the walls. It's amazing how quick they can build homes these days. Here are some drywall pics from today.
Met with the project manager on Monday for the pre-drywall meeting. Found a couple things that needed to be fixed - but other than that - everything is looking good. We went over all of the power outlet locations, light switches, cable connections, interior and exterior lighting, and checked out the heating/air conditioner in the basement.
Family Room / Gas Fire Place |
Living Room / Front Door |
Master Bedroom |
Sunroom |
Sunday, April 12, 2015
Thursday, April 9, 2015