Met with the project manager on Monday for the pre-drywall meeting.  Found a couple things that needed to be fixed - but other than that - everything is looking good.  We went over all of the power outlet locations, light switches, cable connections, interior and exterior lighting, and checked out the heating/air conditioner in the basement.

We were told the insulation would go in and dry wall would begin by weeks end.  Being a little anxious to see how that went - we swung by on Tuesday and all of the insulation was installed.  Here are some pictures of the progress prior to this week and following the insulation being installed.