Met with the project manager on Monday for the pre-drywall meeting. Found a couple things that needed to be fixed - but other than that - everything is looking good. We went over all of the power outlet locations, light switches, cable connections, interior and exterior lighting, and checked out the heating/air conditioner in the basement.
We were told the insulation would go in and dry wall would begin by weeks end. Being a little anxious to see how that went - we swung by on Tuesday and all of the insulation was installed. Here are some pictures of the progress prior to this week and following the insulation being installed.
|
Family Room / Gas Fire Place
|
|
Living Room / Front Door |
|
Master Bedroom |
|
Sunroom |